
28 November 2026 · Cave Mekar Group
Draw the intended notch position and opening direction relative to the closure and seal areas. Include filling arrangements, contents, and resealing needs in the group brief. Ask whether the feature is available on a suitable pouch structure. A notch does not prove easy opening or contents protection without appropriate sample evaluation and approval.
Read article →
28 November 2026 · Cave Mekar Group
Mark the areas that must allow a view through the material and distinguish them from decorative faces. Include drawings, reference examples, lighting context, and the intended assessment. The group team must confirm resin, process, and available capabilities before a quotation. Transparent alone specifies neither clarity, appearance tolerances, nor optical performance.
Read article →
27 November 2026 · Cave Mekar Group
OTR describes oxygen transmission through a material, while WVTR describes water vapor transmission. Compare each figure only with suitable units, methods, temperature, humidity, and specimen type. Film results do not automatically represent finished pouches. Connect requirements to the contents and intended conditions of use, and do not turn barrier figures into a shelf-life promise.
Read article →
27 November 2026 · Cave Mekar Group
Draft is a surface taper relative to the direction a part releases from its mould. Review the opening direction, inner and outer faces, depth, texture, material, and functional requirements before selecting it. One angle does not suit every design, and a successful 3D printed prototype does not establish mould feasibility. Discuss the actual geometry with the production team.
Read article →
26 November 2026 · Cave Mekar Group
Mark the proposed date and batch-code field on the pouch drawing. Assess the empty and filled example, and confirm the coding method and approval scope with the relevant team.
Read article →
26 November 2026 · Cave Mekar Group
Separate plastic and metal drawings and explain the proposed joining sequence. Ask the group to confirm capability before treating insert moulding as an available service.
Read article →
25 November 2026 · Cave Mekar Group
Read article →
25 November 2026 · Cave Mekar Group
Read article →
24 November 2026 · Cave Mekar Group
Read article →