
28 November 2026 · Cave Mekar Group
Mark the areas that must allow a view through the material and distinguish them from decorative faces. Include drawings, reference examples, lighting context, and the intended assessment. The group team must confirm resin, process, and available capabilities before a quotation. Transparent alone specifies neither clarity, appearance tolerances, nor optical performance.
Read article →
27 November 2026 · Cave Mekar Group
Draft is a surface taper relative to the direction a part releases from its mould. Review the opening direction, inner and outer faces, depth, texture, material, and functional requirements before selecting it. One angle does not suit every design, and a successful 3D printed prototype does not establish mould feasibility. Discuss the actual geometry with the production team.
Read article →
26 November 2026 · Cave Mekar Group
Separate plastic and metal drawings and explain the proposed joining sequence. Ask the group to confirm capability before treating insert moulding as an available service.
Read article →
11 November 2026 · Cave Mekar Group
Use one reference view, identify installation positions and record whether both positions share a part or need mirrored shapes.
Read article →
15 October 2026 · Cave Mekar Group
Prepare drawings or CAD files, component functions, materials, quantities, mould details, and critical dimensions for an injection moulding quotation.
Read article →